Work began with an on-site technical assessment to determine where direct capture was sufficient and where visual completion was required.
Targeted CGI Integration
Where demonstration contexts required fuller visual expression, controlled CGI augmentation was introduced to depict accurate operating conditions. Each intervention was cross-verified against engineering inputs to preserve dimensional and process fidelity.
Photographic Base Capture
Live equipment and spatial environments were documented under active-site constraints, ensuring all augmented visuals remained anchored to real geometry, lighting behaviour, and operational context.
Content Structuring
Given the intentionally restricted documentation environment, technical narratives were developed through structured coordination with engineering stakeholders. Emphasis remained on process clarity and application accuracy.
Layout System Build
A custom communication architecture was developed to support multi-channel deployment across investor decks, sales kits, and tender documentation. The layout prioritised rapid technical readability and modular reuse.
Throughout execution, evolving inputs were managed through controlled versioning to maintain alignment with the underlying engineering reality.